Separate Goods Issue Posting  

Use

The consumption of the components in a production process should be posted as a goods issue as soon as possible to ensure that material stock levels are transparent.

If components of a process order or production order are picked as handling units (HUs), it is a good idea to also process the goods issue posting (GI-posting) by way of HUs.

If the GI-posting is to take place separately from material identification or no material identification is to take place, the separate GI-posting can be used as a dynamic function call.

The consumption posting of the components is carried out at HU level. Here you can post goods issues for

An individual goods issue document is created for each HU.

For more information about partial goods issue postings, see Partial Goods Issue Posting with HU.

Integration

Prerequisites

  1. The standard process instruction category MI_HUCNS is maintained in the master recipe.

The following parameters are variable:

Characteristic

Characteristic value

Options

PPPI_BUTTON_TEXT

GI posting

Standard text that appears on the pushbutton of the PI sheet

PPPI_FUNCTION_DURING_DISPLAY

 

Function in the display allowed/not allowed

PPPI_EXPORT_PARAMETER

PPPI_HU_IDENT_LEVEL

I_CHECK

Separate GI posting for order/operation/phase

PPPI_EXPORT_PARAMETER

PPPI_HU_PREREQ_FOR_GOODS_ISSUE

I_VORAUS

Prerequisites:

No prerequisites/ completeness check/ sequence check

PPPI_EXPORT_PARAMETER

PPPI_HU_GET_ALLOWED_VALUES

I_VALREQ

Activation of F4 help to display picked HUs

 

The following parameters are not variable and are copied:

Characteristic

Characteristic value

Options

PPPI_FUNCTION_NAME

COMI_HU_CONSUMPTION

 

PPPI_EXPORT_PARAMETER

PPPI_PHASE

I_PHASE

Phase number is copied

PPPI_EXPORT_PARAMETER

PPPI_PROCESS_ORDER

I_AUFNR

Order number is copied

PPPI_EXPORT_PARAMETER

PPPI_RESERVATION

I_RSNUM

Reservation number is copied

PPPI_EXPORT_PARAMETER

PPPI_OPERATION

I_VORNR

Operation number is copied

PPPI_INPUT_REQUEST

Consumption OK

Status message for carrying out good issue posting

Successful: yes/no

PPPI_IMPORT_PARAMETER

PPPI_STRING_VARIABLE

E_FLAG

VHUMI_CONS_FLAG_&0050&

 

PPPI_IMPORT_PARAMETER

PPPI_STRING_VARIABLE

E_TEXT

VHUMI_CONS_TEXT_&0050&

 

 

Features

After the user has created the components or HUs, the system checks whether the components entered or the HUs were correctly picked and, if maintained in the master recipe, identified.

The system creates a message of the standard process message category PI_HUCNS, which transfers messages to the message destination PI51. When this message is sent, the actual GI posting is carried out.

This process message category is structured as follows:

Characteristic

Description

Required

PPPI_EVENT_DATE

Date of event

 

PPPI_HU_CONS_DATE

Document date for posting

 

PPPI_HU_EXT_ID_NO

External handling unit identification

 

PPPI_HU_ID_NO

Internal handling unit number

 

PPPI_PROCESS_ORDER

Process order

Req.

PPPI_RESERVATION

Reservation

Req.

The message category can also be used by external process control systems.

The standard process message category PI_HUREC allows the data above to be automatically sent to the batch record by way of the process message destination PI01.

For more information, see

Process Message

Monitoring Process Messages.

 

HUs for Order

Choose Logistics -> Central Functions -> Handling Unit Management -> Display Handling Units -> For Process Order to display all information available on the HUs for a production order.

After entering the production order number, a list of all HUs assigned to the order appears. When you select an HU, information appears on the following: