You can now control the end-date for the Individual values PF infotype (0279), for PF recalculations.
Enter a value type in the IMG section
Define control for PF calculations , which is used to read the end-date from the corresponding PC action for PF calculations. In this case, the
calculated end-date is used for the new entry in infotype 0279.