Evaluating the Project Data in the Business Information Warehouse
Purpose
You are the project leader / project controller and you require for project data a meeting. To do this, you transfer data from your R/3 System into the Business Information Warehouse System (BW) using predefined InfoCubes.
You analyze the date of the SAP Business Information Warehouse using the Business Explorer Browser, from which you can call up various reports (queries). The information displayed in Excel is summarized in the background from the datasets.
To find out more about this process, see the SAP Library for the Business Information Warehouse.
For information about the Project System , see Business Content ® Project Management.
Prerequisites
You can only run this process since release BW2.1C.
You need a project. You load the data into your BW System. If you do not create your own project, you should use the data contained in the standard project T-20301.
In addition to your user ID in the IDES R/3 System, you will require a user ID for your BW System.
The following roles must be assigned to your user in the BW System:
Role |
Description |
SAP_BWC_0ROLE_0051 |
Project controller |
SAP_BWC_0ROLE_0052 |
Project leader |
You must install the Business Explorer Browser on your PC.
You must also include your BW System in the SAP Logon using group selection.
To call up the line item reports, we have installed note 356166 in the IDES R/3 System.
Process Flow
To see the data used during this process, choose
.You transfer the data for your project into the Business Information Warehouse System.
This procedure is required if you are using the existing data of IDES project T-20301.
Monitoring the Data Transfer in the MonitorWhen you have started a request to load data, you monitor the status of the transfer.
Assigning Reports in the Business WarehouseTo navigate between the various reports, you link them in the Business Information Warehouse.
Evaluating Data in the Business WarehouseYou evaluate your project data in the Business Explorer Browser. You then call the report Business Project Overview.
Displaying the Original Documents for the Actual CostsFrom the report Business Project Overview you go to your R/3 System, where you display the original documents for the line items.