In this step, you assign a
personnel area grouping for daily work schedules to a personnel area grouping for work schedules.
Personnel subarea groupings for daily work schedules 01-50 are reserved for Personnel Administration, groupings 51-99 for Logistics.
Employees in personnel areas 0001 and 0002 have been assigned to personnel subarea grouping for work schedules 01. Employees in personnel area 0003 have been assigned to grouping 02. All three personnel areas are to use the same daily work schedules. You therefore assign personnel subarea grouping for daily work schedules 01 to personnel subarea groupings for work schedules 01 and 02.
The examples in the standard SAP system represent a 1:1 relationship.
The personnel subarea grouping for daily work schedules (initially 01) which you assign at this point is also used in the subsequent steps.