Group Personnel Subareas for the Daily Work Schedule

In this step, you assign a

personnel area grouping for daily work schedules to a personnel area grouping for work schedules.

Personnel subarea groupings for daily work schedules 01-50 are reserved for Personnel Administration, groupings 51-99 for Logistics.

Example

Employees in personnel areas 0001 and 0002 have been assigned to personnel subarea grouping for work schedules 01. Employees in personnel area 0003 have been assigned to grouping 02. All three personnel areas are to use the same daily work schedules. You therefore assign personnel subarea grouping for daily work schedules 01 to personnel subarea groupings for work schedules 01 and 02.

Requirements

Standard Settings

The examples in the standard SAP system represent a 1:1 relationship.

Recommendation

1. Assign personnel subarea grouping for daily work schedules 01 to personnel subarea grouping for work schedules 01.
2. Initially, always use personnel subarea grouping for daily work schedules 01 for Personnel Administration in the following steps.
3. After you have tested the time data, you can assign further groupings (other than 01) if necessary.

Activities

1. Check SAP's reference entries and do not change them for the first step.
2. You can specify new assignments later, if necessary.

Further Notes

The personnel subarea grouping for daily work schedules (initially 01) which you assign at this point is also used in the subsequent steps.