Evaluating the Planning Run (PP-MRP-PE) 

Implementation Options

During the planning run, the system analyzes the requirements that exist for the planned materials and creates procurement elements that cover these requirements. The evaluations in the PP-MRP-PE component display all receipt and issue elements for a material in the form of a table and enable you to gain a quick overview of the stock/requirements situation for the material as well as to branch into the editing function for the MRP elements for this material.

Features

The following evaluations are available for analyzing the planning result: