Creating a Cost Estimate with Quantity Structure
The screen Create Material Cost Estimate with Quantity Structure appears.
For more information, see
For more information, see
If you do not enter a lot size, the system uses the costing lot size from the costing view of the material master record.
For more information, see
You can enter a production version or data for BOMs and routings. You cannot enter both the production version and a BOM/routing. If you do not enter any data for the quantity structure, the system selects a valid quantity structure for the cost estimate.
For further information, see the following:
The dates are proposed from the settings in the date control ID. The settings in
date control also determine whether you can change the proposed dates.If you have changed the costing dates, you can copy the proposed dates by choosing Default values.
The system costs the material. The system creates the quantity structure, determines the costing levels, valuates the quantity structure and calculates overhead.
You see the costing results for the highest material.
For more information about displaying and analyzing the results, see the following:
For more information, see Saving Material Cost Estimates.
See also: