Perform Multi-Step Material Requirements Planning  

Use

You plan the material requirements for your plant Wichita. You determine the engine requirement deadlines and quantities. You plan on the basis of current material stocks, existing sales orders and expected requirements.

Procedure

  1. Call the transaction as follows:
  2. Menu Path

    Logistics ® Production ® MRP ® Planning ® Single-Item, Multi-Level

    Transaction Code

    MD02

  3. Enter the following data:
  4. Field

    Data

    Material

    IAD-3000

    Plant

    3600

    Planning mode

    3 (Delete and recreate plan data)

    Also plan unchanged components

    Select

    Display material list

    Select

    Accept the default values for the other control parameters.

  5. Choose and confirm the warning message with .
  6. The multi-step engine requirements planning is performed.

  7. Choose Materials.
  8. The engine BOM is expanded in the requirements planning. The engine is listed in the first position with its components below.

  9. Select the first item in the list (the engine) and choose Selected results.
  10. You see the planning results based on the planned orders generated during MRP for the engine.

  11. Choose in the planned order row to select a planned order.
  12. You can analyze the planned order in the dialog box.

  13. Choose .
  14. Choose until the Single-Item, Multi-Level screen.
  15. To investigate other secondary requirement planned orders, perform steps 5 - 8 with the following positions in the list.
  16. Choose until the overview tree appears.