Activating Availability Control
Use
In the budget profile, you use the Activation type to specify whether and / or how the availability control is to be activated.
Features
There are three different types of activation:
If you selected background activation, you can activate the
availability control online for a particular project.Activities
When availability control is activated, the system does the following:
After activation, each posting to the project is checked by the availability control.
As availability control affects system performance, you should activate it in the background for projects with less detail, only when you think that the budget may be exceeded.