Reference and Simulation Costing: Process Flow 

Purpose

You use base planning objects for the following purposes:

For more information, see Costing Sequence and Base Planning Objects.

Prerequisites

Editing costing items is always based on a costing variant. For more information, see Preparing for Base Object Costing.

Process Flow

  1. You create a base planning object with master data and costing items.
  2. For this, you can use either the classic, single-level unit costing or multilevel unit costing.

    For more information, see Creating Base Planning Objects and Creating Costing Items.

  3. The system valuates the costing items entered and calculates the overhead (including process costs).
  4. For more information, see Valuation of Costing Items and Overhead Costs in Base Object Costing.

  5. You save the base planning object and use the reports in the Product Cost Controlling Information System to analyze the costing results.

For further information, see the following:

  1. You can use an existing base planning object for the following purposes:

For further information, see the following: