Replenishment with Summarized JIT Calls 

Use

With the summarized JIT call you can take quantities from the production system that are relevant for delivery and transmit them to the vendor. The delivery of a summarized JIT call can be specified to the hour and minute and can also take place several times a day. You have the option of grouping several material requirements to a JIT call. In addition, a JIT call can contain an unloading point for the materials.

You do not create JIT calls from MRP, but from production.

First, you generate schedule lines from requirements planning as a forecast, which you transmit as a forecast delivery schedule or a JIT delivery schedule to the vendors and which is not relevant for delivery for the vendors.

As soon as you actually require the material in production, generate a summarized JIT call, which is relevant for delivery, by setting a kanban to EMPTY or create a new item in an existing JIT call. You can trigger a summarized JIT call both via classic as well as event-driven KANBAN.

Features

- You can group all material requirements/kanbans, whose delivery dates are in a specific period of a shift sequence or a planning calendar.

The grouping can take place both using exact days or times.

- You can group requirements via a plant or via a combination of plant and unloading point.

If you group according to delivery date you must simultaneously group according to plant or according to plant and unloading point). You can, however, group according to plant or plant and unloading point, without having to group according to delivery date.

To group kanbans, see also Grouping Kanbans to a Summarized JIT Call.