Construction Industry: Reform of Social Fund Procedure

Scope of Functions

The following reports are required for the notification procedure which will apply from the year 2000 and is required by the collective agreement for social funds (VTV):

The following reports are also useful:

Functional Improvements From the Year 2000

The following changes have been made to meet the requirements of the new notification procedure.

Transition to New Procedure

Note the following when converting from the old procedure (version 3) to the new procedure (version 04):

The new procedure creates the data record NEMEL in December 1999. This notification opens the account for version 04 at the social fund.

Automatic corrections for periods for which notifications have been created with version 03 can take place until the period February 2000.

From March 2000, corrections can only be made manually.

This means the following for the transitional period: If retroactive runs take place for periods with version 03, the program for version 03 (RPCBLFD0, RPCBLHD0) must be started as well as the program for version 04.

Automatic corrections are submitted in a subsequent notification. Manual notifications are displayed in program RPCBLFD0.

The conversion can only take place within a SAP System at a defined time. If SAP Systems are added at a later date, all SAP Systems must have been converted at the same time.

Customizing