| repair-based planning |
The SNP Heuristic is used as part of a repair-based planning process consisting of the heuristic, capacity leveling, and deployment. The heuristic processes each planning location sequentially and determines sourcing requirements. The heuristic processing lumps all requirements for a given material in the location into one requirement for the period. The heuristic determines the valid sources and quantity based on pre-defined percentages for each source, then passes the requirements through the supply chain to calculate a plan; however, this plan is not necessarily feasible. The planner uses capacity leveling to formulate a feasible plan. In this sense, the planner must repair the plan to make it feasible.