Show TOC
Release of
Multi-Level Actual Costing 
Description
In Release 4.5A, the Actual Costing/Material
Ledger component has been expanded to contain functions for multi-level actual
costing for materials.
This function is officially released as of
Release 4.5B. Please note, however, the following restrictions:
- Valuated sales order stock is not included in
multi-level actual costing.
- Cyclical structures are ignored by the system
upon multi-level actual costing.
WIP quantities are
not recognized by the quantity structure in multi-level actual costing.
Consequently, variances from a production level are rolled up into the next
production level without taking work in process into account.
- Stock transfers, material to material, are not
considered multi-level transactions in the context of multi-level actual
costing.
Further
notes
For detailed informationen about multi-level
actual costing, see the documentation Actual Costing/Material
Ledger in the R/3 Library.