Show TOC
Changes to the
Application Component Hierarchy 
Description
In release 4.5B, we have changed the
Application Component Hierarchy (ACH) for the Compensation Management
component. These changes enable us to break the functionality belonging to
this application component into smaller units.
The process modelling and data modelling
processes and the new terminology triggered these changes. The changes to the
ACH:
- Reflect the functional capabilities of the
component
- Standardize the terminology used in all areas
of Compensation Management
- Reduce the deviations between Implementation
Guide, the ACH and the SAP R/3 System.
The ACH for Compensation Management is as
follows:
- PA-CM Compensation Management
- PA-CM-JP Job Pricing
THis node is new as the Job Pricing tool was considerably enhanced in the 4.5x
releases.
- PA-CM-PL Budgeting
This node used to be called Plans. Seeing as the term
plan does not exist as of 4.5A, we simply renamed this node.
The two components (Plans and Budgeting) are not comparable, so if you have
assigned any company-specific activities, reports, or documentation to this
node, you will need to reassign them to the relevant node.
- PA-CM-AD Administration now comprises the
following:
- PA-CM-AD-PG Compensation Packaging
- PA-CM-SC Pay Scale Changes
- PA-CM-CP Personnel Cost Planning
As a result of these changes, you will have to
check the assignment of company-specific reports, activities, documentation,
etc. and reassign them where necessary.