Show TOC

Materials Management

In this section, you make the required configurations for integration between Training and Event Management and Materials Management (MM).

You can make these settings using a wizard that guides you through the configuration step by step, or you can configure the settings individually.

Note

Integration with MM makes sense if you want to use materials from the material master as resources for your events.

For material orders and reservations (as for billing, activity allocation, and cost transfer posting purposes), you require a number range interval that you create under Number Range Maintenance in the step Define Number Ranges for External Operations

If you run Materials Management and Training and Event Management in distributed systems (HR and LO in different systems), you must also note the information contained in Set Up Material as a Resource in Training and Event Management.