| plan credit |
Value with which an object is planned to be credited.
In Cost Object Controlling, the plan credit is the value at which an order is anticipated to be credited as calculated in the preliminary cost estimate for the order.
The system calculates the planned credit by multiplying the planned order quantity by the value to be used for credits as specified by the price control.