For MRP withMRP areas, it may be necessary to assign a large number of MRP areas to a material. An example is when materials for many automobiles are stocked in a spare parts warehouse for customer service technicians, and each automobile is planned as its own MRP area.
Up to now, there was no specific function for maintaining this mass data. The manual assignment of MRP areas involved a lot of effort. You had to create an MRP area segment, with specific planning and forecasting data, for each MRP area in the materials master of the respective material.
SAP now provides six function modules (function group MD_MGD1), with which you can program your own mass transactions.
These function modules include:
SAP provides the example report RMMDDIBE which integrates all the function modules. You activate the report by following the menu path System --> Services --> Reporting . You can save the result of the report, and check it by accessing transaction SLG1.
The report is only an example, and is neither maintained nor developed further by SAP.