In this release, the processing of PI_PROD messages when inspection points are used has been changed as follows:
Transfer of PI_PROD Messages to MM or QM
In previous releases, PI_PROD messages were always used sent to the Quality Management (QM) component when you had specified in the QM data of the recipe header that you wanted to use inspection points for inspection results recording.
As of Release 4.6A, PI_PROD messages are only transferred to QM if you use inspection points and at least one of the following processing steps is defined:
In all other cases, the PI_PROD message is now directly sent to materials management. Note that the message is posted to unrestricted stock unless you have assigned a different stock type in the order header.
Goods Receipt Posting for PI_PROD Messages from QM
In the master recipe, you can set the Last p. lot assign. indicator in the QM data of an operation or phase. The system can propose the yield recorded in the inspection point for this operation or phase as the product quantity during manual goods receipt in inventory management.
In previous releases, the yield from the inspection point had to be reported to the order if you wanted the system to do so.
As of Release 4.6A, the yield of the inspection points of the relevant operation or phase is always proposed during manual goods receipt in PP-PI, irrespective of whether a confirmation was made from QM or not.