Process Work Time Events

In this step, you schedule jobs to post work time events and transfer the corrected actual times to Logistics.

Example

You want to process work time events once daily, overnight.

Notes

Posting work time events can be started by a specific event. To do so, schedule the starting time After event in the Create session to run background job in report SAPCDT46. Use the event SAP_KK1_UPLOAD_FINISHED with parameter 3.

Activities

1. Decide which parameters should be used to start the reports. Then define appropriate variants for the reports.
2. Define a job to start the reports to process the session as follows:

Further Notes