automatic reorder point planning

Material Requirements Planning (PP-MRP)

Special procedure in consumption-based planning.

If available stock falls below the reorder point, then an entry is made in the MRP file indicating that the material is to be included in the next planning run. Then during the next planning run a procurement proposal is created.

The reorder point and the safety stock level are automatically determined by the forecast program.