Production Resources/Tools 

Use

Production resources/tools (PRTs) are mobile operating facilities used in production or plant maintenance. The R/3 System distinguishes between the following types of production resource/tool on the basis of their attributes and business function:

In the following objects, you can assign PRTs to operations and phases:

If a PRT is required for inspections during production, you can assign it to the relevant inspection characteristic in the task list as test equipment.

Integration

Using the classification system, you can group PRTs according to your own criteria, making it easier to search for the PRTs.

You can also link PRTs to document info records to refer to additional information such as a design drawing.

Prerequisites

The standard R/3 System contains the special material type FHMI for production resources/tools. The standard system is configured such that the user department Production Resources/Tools appears only for materials of this material type. However, your system administrator can change this in Customizing for the Material Master in Define Attributes of Material Types.

Since PRT data is created at plant level, you are required to specify a plant in the Organizational Levels dialog box to access the data screen for this user department.

Activities

In the material master record of a PRT, you specify data required by PRT management. For information on PRT management, see Production Resources/Tools in the SAP library documentation PP Routings.