Displaying Profitability Reports 
You can display the rebate data in the profitability report. However, before you do that, the following provides you with an overview of the single line items that were transferred to Profitability Analysis and whose data you can call up with the different views in Reporting.
Product hierarchy 2 |
Customer |
Article |
Rebate provisions |
Rebate payments |
Difference |
0011000105 Gloss paint |
6002 |
Y-352 |
500 |
3000 |
-55 (actual rebate is greater than provision) |
|
6006 |
Y-353 |
2000 |
|||
0011000110 primer |
6002 |
CH_5103 |
490 |
595 |
+238 (actual rebate is smaller than provision) |
|
6006 |
CH_5103 |
343 |
|||
Total |
3333 |
3595 |
- 312 |

If this is the first time you are carrying out a profitability analysis transaction, the R/3 System displays the
Set Operating Concern dialog box.Complete the input fields:
Field |
Data |
Operating concern |
IDEA |
Type of Profit. Analysis |
costing-based |
Confirm your entries.
This dialog box will only be displayed once during the scenario. Once you have made this selection, the R/3 System automatically selects the correct operating concern and profit analysis type.
Field |
||
Reports |
IDES-170 |
Rebate |
The
IDES-170: Volume-based Rebate should display the parameters from the report. If this isn’t the case, enter the following data:
Field |
Data |
Description |
Period from |
Current month |
|
Period to |
Current month |
|
Plan/act. ind. |
0 |
Actual data |
Version |
Leave blank |
|
Record type |
F |
Billing data |
In the top line of the
Execute Drilldown Report "IDES-170": Drilldown list , you can see that sales organization 1020 and distribution channel 20 have been determined for this report. You can page through the other characteristics as you require. The value fields displayed are for the billing quantity, revenue and rebate value.
For more information about the functions in Reporting, see
Executing an Existing Report in CO-PA and Getting to Know Reporting Functions.
You can see the product hierarchy for gloss paints in the same way by going back three steps and implementing steps 7 - 11 for product hierarchy 0011000105.
End of the process chain.