Simulating a Capacity Change in a Work Center Hierarchy 
This procedure places a new capacity load on the work center hierarchy to see the increased load on both the hierarchy and an individual work center in the hierarchy. You viewed the capacity of the work center hierarchy in the previous procedure. This procedure simulates new capacity requirements on the work center hierarchy.
Field |
Data |
Material |
P-103 |
Plant |
3000 |
Requirements type |
blank |
Field |
Data |
Reqmts.dt. |
2 months in the future, e.g. |
Planned qty |
250 |
The system displays the total value.
The system might display a dialog box asking if you want to accept the total quantity.