Editing Bills of Material 

Use

You use this procedure to edit alternative bills of material (BOM) for the master recipe header materials in the master recipe itself.

If you have not yet edited a BOM from within a master recipe, you can also edit it in BOM management. Note, however, that the master recipe does not support the parameter effectivity of engineering change management (see Engineering Change Management and Recipe Approval). For this reason, you may only use change numbers with date validity for BOMs that you want to use in master recipes.

Prerequisites

Procedure

  1. Go to the material list of your master recipe (Materials tab).
  2. If more than one header material and/or production version exists for your recipe, select the material or production version whose alternative BOM you want to edit.

Depending on whether you edit a new or an existing alternative BOM, the system takes you to:

  1. Depending on the function you want to carry out, proceed as follows:

Function

Procedure

Create an alternative BOM

Choose on the initial screen.

Change an alternative BOM

Choose BOM in the material list.

The item overview of the BOM appears.

  1. Enter the relevant data for the bill of material.

For more information on how to do this, see the SAP Library Bills of Material Guide (PP-BD-BOM), section Steps in Creating a Simple Material BOM and Changing a Material BOM.

  1. Go back to the master recipe.

The system saves the BOM when you save the master recipe.