Maintenance Plan Costing 

Use

You can determine the expected costs for maintenance plans for a period using maintenance plan costing (see also Example of Maintenance Plan Costing).

Prerequisites

The following prerequisites must be fulfilled:

Features

The system determines the costs to be expected for the specified period as follows:

The costs determined are planned costs and not actual costs, and are determined from the following sources:

These contain the time or performance condition when maintenance must be performed.

This contains the activities to be performed together with the corresponding quantities (for example, internal and external services, required materials).

The system does not determine any overhead costs. You cannot perform a costing for multiple counter plans.

When costing for strategy plans, note the following:

The system uses the currently valid tariffs for the cost tariffs on which the costing is based. These tariffs are calculated from the activity type and cost center. If you have changed tariffs for the future, these will not be considered by the system which also uses the current tariffs here.

You will find additional information on