Define Start Time of Sporadic Background Jobs

In this step, you define the start time for sporadic background jobs.

The following background job is available:

"MRP record creation in repetitive manufacturing"

This background is only relevant if you work with BOM explosion numbers.

The BOM explosion number is used to determine the date that the bill of material is to be exploded for all BOM levels. If no BOM explosion number exists, the order start date of each planned order is used in the standard system as the explosion date for the BOM level.

The background job for "MRP record creation when changing BOM explosion numbers" is used to make an entry in the planning file when:

Actions

Enter the start time for the background job.