Activate Runtime Statistics

In this step, you define and activate the runtime statistics. These statistics are used for checking the validity period of planning runs.

For each plant, you can specify,

An entry is made for the multiple of this value.

Example

For a value of 5, the system makes an entry in the runtime statistics for every fifth material that is planned. For a value of 1, the system makes an entry for every material included in the planning run.

Actions

1. Activate the runtime statistics for your plants.
2. Determine the scope of the runtime statistics.