Activate
Runtime Statistics
In this step, you define and activate the
runtime statistics. These statistics are used for checking the validity period
of
planning runs.
For each plant, you can specify,
- whether the system should calculate the
statistics
- for which materials an entry in the runtime
statistics is to be made during the planning run. You thus define the
exactness of the statistics
An entry is made for
the multiple of this value.
Example
For a value of 5, the system makes an entry in
the runtime statistics for every fifth material that is planned. For a value
of 1, the system makes an entry for every material included in the planning
run.
Actions
1. Activate the
runtime statistics for your plants.
2. Determine
the scope of the runtime statistics.