Prerequisites
The functions of automatic planning run similarly to those of interactive planning. The procedures and various details of automatic planning are described below:
Procedure
Initial Screen
Enter the following details for plan data:
Enter the following details for reference data:
Enter the necessary details for function:
The function determines how the plan data is to be processed. You can find more information about the various functions under:
Seasonal Distribution Revaluation Forecast Top-Down PlanningEnter the following details for extras:
Enter the necessary details for updating:
With the exception of top-down planning, which is always updated directly, you can either update the plan data directly or by using the data transfer functions. The latter entails updating using a sender structure and transfer rules. For more information see
Automatic Planning.Selection of the Characteristics
After you have made your entries on the initial screen, choose Choose characteristics. On this screen you can further limit the selection of plan data to be copied by selecting certain characteristics. If you only wish to edit data for regions and areas, for example, you can select the characteristics region and area.
If you are working with the characteristic data area in your aspect, you have to enter a characteristic value. The data area holds the default currency for the basic key figures and must, therefore, be specified.
Selection of Key Figures
Choose Choose key figures to further limit the key figures. If you want to plan only sales volume and revenue, for example, select these fields.
If you have created calculation formulas for certain basic key figures in planning, and wish to use these in automatic planning and write them to the database, select the relevant key figures. If you do not select a basic key figure for calculation, it will not be calculated with the stored formula, but will be processed like the other key figures. This might be, for example, an increase of 5% or a forecast. You can find further information about this in Customizing.
In top-down planning you enter a reference base for the value distribution For more information see
Top-Down Planning.Characteristic Value Restriction
Choose Continue to further limit the characteristic values. If you want, for example, to plan the regions South and East only, enter single values or an interval.
Then the initial screen is displayed again. Choose Planning run ® Execute to carry out the automatic planning.
Background Processing
If you wish to change a lot of data you will be recommended to let the automatic planning run in background processing. After you have maintained all planning screens, you can store your settings for these as a planning screen variant under Goto ® Save variant. While the automatic planning is running the program RKCPLEXE is called up. Using a variant for this program, you determine which aspect the data is to be read into and with which planning screen variant. Then you plan the program in background processing.
Result
The plan data is generated automatically according to the function you have selected, and is saved to the database if required. If a log has been kept, it is displayed automatically during online execution, or written to the spool during background processing.