PP KANBAN
   PP KANBAN
      KANBAN Versus MRP
      Various Options for Carrying Out KANBAN
         Classic KANBAN
         Event-Driven KANBAN
         One-Card KANBAN
         KANBAN with Quantity Signal
         KANBAN Replenishment: With or Without MRP
            Storage Location Assignment for KANBAN
               Storage Location and Supply Area Determination in
            KANBAN Without MRP
            KANBAN With MRP
      Master Data for KANBAN
         Supply Area
            Defining the Supply Area
            Person Responsible for KANBAN
         Control Cycle
            Creating/Changing Control Cycle for Classic KANBAN
               Defining Replenishment Strategy in Control Cycle
               Defining Automatic Kanban Calculation in Control C
            Creating/Changing a Control Cycle for event-driven
         Settings for Replenishment Strategies
            Creating the Replenishment Strategy
            Changing the Replenishment Strategies
         Automatic Kanban Calculation
            Carrying Out the Automatic Kanban Calculation
            Checking and Copying Automatic Kanban Calculation
            Accessing the Error Log
            Calculating Depndt Reqmts for Automatic Kanban Cal
            Smoothing the Dependent Requirements
            Calculating Replenishment Lead Time and Convertin
            Calculating the Number of Kanbans/Kanban Quantity
      KANBAN: Functions and Procedures
         Status Change/Kanban Signal
            Status Sequence
            Triggering the Kanban Signal
               Triggering Kanban Signal for Event-Driven KANBAN
               Triggering the Quantity Signal
               One-Card KANBAN / Using a Special Logic for Trigge
               Backflush
                  Backflushing
            Separating the Status Change from the GR Posting
            Independent Supply Source/Separation of Status Cha
         Kanban board
            Kanban Board from Demand Source View
            Kanban Board from Supply Source View
         Kanban Correction
            Correct a Kanban
         Printing and Circulating Kanbans
            Set to Single Kanban Print
            Set to Regular Kanban Print
            Collective Kanban Print
               Printing Kanbans Collectively
         Sending a Kanban as an EDI Message
         Replenishment Strategies
            Replenishment Strategies for In-house Production
               Replenishment Using Manual Kanban
               Replenishment Using Run Schedule Quantities
               Replenishment Using Production Orders
               Kanban Control: In-House Production
            Replenishment Strategies for External Procurement
               Replenishment Using Standard Purchase Orders
               Replenishment Using Stock Transport Orders (Plant
               Replenishment Using Scheduling Agreement
               Replenishment Via Summarized JIT Calls
                  Creating and Transmitting a Summarized JIT Call
                     Determination of Delivery Date
                     Grouping Kanbans to a Summarized JIT Call
                        Example for Summarizing According to Delivery Date
                     Creating a Summarized JIT Call
                        Structure of Message Determination
                        Creating Message Condition Records
                     Transmit a Summarized JIT Call
                     Display or Change Summarized JIT Call
                     Example for the Summarized JIT Call
                  Goods Receipt with Summarized JIT Call
               Replenishment Using Source List
               Kanban Control: External Procurement
            Replenishment Strategies for Stock Transfer
               Replenishment Using Reservation
               Replenishment Using Direct Transfer Posting
                  Replenishment with WM Based Storage Locations
               Transfer Posting Using Replenishment Elements from
               Replenishment from WM Based Storage Locations
         Specialized KANBAN processes
            Cross-Plant KANBAN
            Procurement and Withdrawal to Cost Center
            KANBAN with SD Delivery
      Cost Object Controlling for KANBAN
         Cost Collector for KANBAN
            Creating the Cost Collector
            Changing the Cost Collector
            Displaying the Cost Collector
         Cost Object Controlling
            The Basics of Cost Accounting
               Production Costs
               Material Costs
               Overhead Costs
            Settling Collected Costs
               Settlement Profile
               Settlement Structure
               Settlement Rule
            Preconditions for Determining Costs and Settlement
            Effects of Backflushing on Calculating Costs
            Calculating and Assigning Costs
            Carrying Out Settlement
      Evaluations
         Plant Overview
         Accessing the Control Cycle and Kanban Overview
         Displaying Errors
   KANBAN on the Internet (PP-KAB-CRL)
   Confirmations to PP-PK (CC5)
      Record Types