Displaying the Cost Collector 

  1. To display a cost collector, starting from the main KANBAN menu select Cost collector ® Display.
  2. The system branches to the Display Production Cost Collector screen.

  3. If you want to display:
  4. – the cost collector for a material, enter the material number and the plant.

    – the cost collector for a material and a production version, enter the material number, the plant and the production version.

  5. Select the Kanban field, and press ENTER .

The system branches to the display screen of the production cost collector.