Cost objects can be controlled in various ways for KANBAN, depending on the replenishment elements that are used to control the control cycles. If you use:
- run schedule quantities, the costs are collected at a so-called cost collector and can be settled periodically in product costing.
- manual kanban, the costs are also collected at a cost collector.
- production orders for controlling replenishment, the costs are settled to the individual production orders.