Scheduling Actions in the DBA Planning Calendar 
Use
This section tells you how to schedule actions in the
DBA Planning Calendar, which is part of the Computing Center Management System (CCMS).Prerequisites
Procedure
The system displays actions already scheduled on the chosen day.
The system displays the actions supported by the Planning Calendar for your database platform.
The system shows the basic parameters currently set for the action.
Parameter |
What to enter |
For example |
Start time |
|
17:00 This means the job is to be executed at 5 o'clock in the afternoon. |
Period |
The interval for the action, in weeks. The action is repeated at the interval you enter. If you do not enter a value, the action is run once only. |
2 This means the action is to be repeated on the same day and time every two weeks. |
Calendar |
Select the calendar for your country or area. |
US This means the calendar for the United States is to be used. |
The system warns you if there is a conflict with an existing action. If so, you must choose another time for the action.
Depending on the action you are inserting, the system may prompt for further input parameters.
The system shows the basic parameters currently set for the action.
The system warns you if there is a conflict with an existing action. If so, you must choose another time for the action.
The system asks you to confirm the deletion.
The system deletes the action, including the corresponding background job. Deletion of the job also stops automatic periodic repetition of the action, if that was scheduled.

If an action is one of a sequence, you can only change or delete the next scheduled occurrence of the action. If you do this, the system also deletes all future occurrences of the action in the same sequence.
For example, you cannot change or delete an action scheduled to run in six weeks’ time, if the next action of the same sequence is scheduled to run next week. Instead, you have to change or delete the occurrence for next week.
Result
The schedule of the DBA Planning Calendar is updated with the results of your insertion, change, or deletion.
See also:
Choosing a Predefined Action Pattern in the DBA Planning Calendar DBA Planning Calendar (Informix)