Maintaining Attendances With Quota Deduction 
Prerequisites
Attendance types with quota deduction are attendances that can only be entered if the employee has already been assigned a quota in the Attendance Quotas infotype (2007). The system automatically updates quota deduction.
An attendance with quota deduction is an attendance such as Attendance For Quota Days.
Procedure
– Maintaining Full-Day Attendances
If you do not want to enter any additional specifications, you can save the data record as it is.
– Maintaining Partial Day Attendances
To maintain partial day attendances, enter either a time or a duration.
If you only enter one clock time, the other clock time is determined from the specifications in the employee’s personal work schedule.
If you enter only one duration, the system calculates the attendance hours from the start of working time specified in the employee’s daily work schedule, depending on the settings made in Customizing.

Quota deduction is either calculated in hours or days depending on the settings made in Customizing. In some cases, an entire day could be deducted from an employee’s quota, when only a four-hour attendance is entered.
Note: The standard R/3 system does not use the Wage type field!
For more information on Activity Allocation and Cost Assignment, refer to the
Integration with Controlling section.Result
You have now maintained an attendance with quota deduction using the Attendances infotype (2002).