Allocating Components to Other WBS Elements 
Use
You use transfer control to allocate individual material components to another WBS element.
Transfer control has two functions:
Procedure

If the component is kept in project stock, the system also changes the stock segment.
If you want the requirements of the corresponding components to be consumed(if they are in project stock),they must both be assigned to the same WBS element, since