Creating a Standard BOM for Allocating Material  

  1. Choose Logistics/Accounting ® Project management ® Basic data and then Standard structures ® Standard network ® Change or Create.
  2. Enter a standard network and choose Activities.
  3. Select the required activities in the activity overview and choose Activities ® Component overview or choose Goto ® Comp.Overview Netwk.
  4. The Bill of Materials dialog box appears.

  5. Enter a plant but not a material and choose Standard BOM.
  6. The Material Component Allocation screen appears with the message No valid bills of material exist. Do you want to create a BOM?

  7. Choose Yes.
  8. The initial screen for creating a BOM appears. The system identification is displayed in the Standard object field.

  9. Enter the BOM usage and choose Enter.
  10. The Create Standard BOM: Material Item Overview screen appears.

  11. Enter the material components and quantities that you want to allocate to the standard network.
  12. If required, enter detailed data about the BOM.
  13. For more information, see the Bill of Materials (PP-BD-BOM) component.

  14. Choose Back to save the standard BOM and to return to the component overview.
  15. Select the material components.
  16. To allocate the material components to standard network activities, choose New allocation.
  17. Save the standard network.