Date shift
Definition
This indicator determines that the system checks the protected time period when you process a change master record or change object.
Use
If you process an object within the protected time period, you see either a warning message or an error message.
The check is made in the following processing situations:
- Processing a change master record
- Entering the valid-from date
- Entering an alternative date
- Shifting the valid-from date or alternative date
- Allocating an alternative date to a change object or deleting an allocation
- Processing a change object with reference to a change number whose valid-from date is in the protected time period
- Changing a change object (for example, BOM or routing)
- Assigning or changing a revision level
Dependencies
You can enter a number of calendar days in the field Warn. time in days and/or
Error time in days. This number of days is then used to calculate the period.