THis indicator ensures that the
leading change master record can be released for costing, planning, and production eeven if not all the allocated change packages have been technically released.
If you set this indicator, you can:
You can release a change package technically in the change master record (change header) by choosing the following: Edit -> Technical release. The system automatically sets the Technical release indicator.