Define default values for cost object controlling
In this step you define the default values for the production cost collectors for each plant and order type.
The default rule determines how a rule for settlement is created.
For production cost collectors, settlement is always carried out by period. With periodic settlement, the
work in process
and variances are reported on the basis of the quantities confirmed and delivered during the period. The default rule is PP2
(periodic settlement).
- Settlement with a cost object hierarchy
For production cost collectors and orders that are assigned to a
cost object hierarchy, settlement
must always be periodic.
You also specify the following:
The results analysis key controls the calculation of work in process
for run schedule headers for which reporting point quantities were entered.
You only need to specify the results analysis key if you have defined
in the repetitive manufacturing profile that reporting point quantities can be entered.
This costing variant determines what costing type and valuation variant
is used in the version-specific cost estimate. A separate version-specific cost estimate is created for each
run schedule header. The
version-specific cost estimate is mainly used to determine the activity
quantities for the confirmation. It can also be used for the valuation
of work in process and scrap, as well as for variance calculation and distribution.
You only need to specify this costing variant if you have specified in the repetitive manufacturing profile that:
- The internal activities should be valuated
- The data in the version-specific cost estimate is confirmed
- Or when you want to valuate work in process and scrap on the basis of the version-specific cost estimate
The valuation variant selected through the costing variant is displayed
for informational purposes. The valuation variant determines how the
material costs and internal activities in this cost estimate are
valuated. The quantity structure for this cost estimate is created from the data in the
production version.
- Costing variant (simultaneous costing)
The costing variant (simultaneous costing) determines what valuation
variant is used if according to the repetitive manufacturing profile the confirmed activities are valuated.
You only need to specify the costing variant if you defined in the
repetitive manufacturing profile that the internal activities are to be
valuated. Depending on the repetitive manufacturing profile, the activity quantities can be determined in the following ways:
- With the version-specific cost estimate
The valuation variant selected through the costing variant is displayed
for informational purposes. The valuation variant determines the following:
- Which activity price is used to valuate the internal activities
Requirements
If you want to define your own costing variants, valuation variants,
and results analysis keys, you must already have carried out the following steps:
To determine whether you must specify a costing variant or a results analysis key, carry out
Check confirmation data for repetitive manufacturing profiles
Standard settings
The standard system contains the following default values for cost object controlling with repetitive manufacturing in plant 100:
| OrdT | DRul | PreC | SimC |
| RM01 | PP2 | PREM | PPP3 |
Actions
Specify the default values in accordance with your requirements.
Further notes
If you want to work with run schedule headers and production cost collectors, you should also check to be sure that the
Order management indicator is set for each fiscal year in the controlling area.
Define controlling area