After a reporting point backflush, the system carries out the following activities:
If a planned order, for which dependent requirements have already been reduced, is displaced or deleted between two backflushes or if a new planned order is created after reversing the backflush then the dependent requirements are not automatically adjusted. This adjustment is not made until the next backflush.
To adjust the dependent requirements before the next backflush, you can plan a background job in this step.
This background job is especially useful if a long period of time exists between the backflushes and the planning between two backflushes is often changed.
Requirements
Create a variant for program RMSERI3.
Activities
In this step, plan the parameters for the background job.