Creating Production Versions with a Reference
Prerequisites
When you create a material master record specifying a reference material and reference plant, the system proposes the production version data of the reference material. However, this requires the Reference indicator to be set for field MARC_MKAL. This indicator is already set in the standard R/3 System. In Customizing for the Material Master, you can check whether it is set in the activity Assign fields to field selection groups.
Procedure
The Production Version Overview dialog box appears.