J22 - Cost Object Controlling - Repetitive |
||||||||||||||||||||
PurposeThis building block provides all the settings that are required for performing cost object controlling by period. Preliminary costing, simultaneous costing, and period-end closing are supported. Function ListThe following functions are provided by the building block J22:
Key Points
|
| |||||||||||||||||||